Entry Doors Evergreen Park
Materials Used:
This Entry Doors Evergreen Park, 60805, project began in March 27th 2003 to replace several windows that were not energy efficient in the dining room. We recommend three lite casement windows with triple glazing, double low-e, and argon gas in all chambers. The project was completed on my 29th 2003. Enjoying the three new windows in his dining room, Mr. Madina called to install three new triple pane, double glazed, double-hung windows in the upstairs bedrooms. This project was completed in November 6th 2006. The Madina family was satisfied with the quality and comfort that Uhlmann Home Improvement provided.
Needing a new look for the front door, the Medina family again solicited Uhlmann Home Improvement. Mr. Medina selected a Castlegate Steel Entry Door OEDR76 with Peninsula glass. The exterior of the door was painted tutor brown and the interior of the door was stained American oak. The exterior jam was painted in the tutor brown to match the door. We also provided new interior colonial casing that was stained colonial oak to match the door. The family was also provided with a fox weld one lite storm and screen door with a tutor brown finish. In addition to this project, we removed an old garden window, and installed new alside white double-hung windows (triple glazing, double low-e, and argon gas injection). This project was completed on March 18th 2010.
Entry Doors Evergreen Project Details
Job Duration:
Project 1: 1 day
Project 2: 1 day
Project 3: 3 days
Job Costs:
Project 1: $
Project 2: $
Project 3: $$